Bullet Train A Reality Soon: Electrification Work Begins On Mumbai-Ahmedabad High Speed Corridor

In an official statement released by the National High-Speed Rail Corporation Ltd., it stated that in total, over 20,000 masts, ranging from 9.5 to 14.5 meters in height, will be installed along the corridor.

Jan 17, 2025 - 14:40
 0  11
Bullet Train A Reality Soon: Electrification Work Begins On Mumbai-Ahmedabad High Speed Corridor
In an official statement released by the National High-Speed Rail Corporation Ltd., it stated that in total, over 20,000 masts, ranging from 9.5 to 14.5 meters in height, will be installed along the corridor.

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow